Document Number |
Description |
Author |
File Size |
Mailing |
91-001R1.TXT |
SCSI-3 Wide Bus Driving Rules Selection and Reselection Phases |
J. Lohmeyer |
3922 | [3/7/91] |
91-002R0.PDF |
Analysis of long single-ended buses |
K. Chan |
186005 | [ ] |
91-002R1.PDF |
Analysis of long single-ended buses |
K. Chan |
2143285 | [3/7/91] |
91-003R0.PDF |
P1394 High Speed Serial Bus -- A Technical Summary |
M. Teener |
10847335 | [3/7/91] |
91-004R0.TXT |
Costa Mesa Working Group Minutes |
Lamers/ Lohmeyer |
22945 | [3/7/91] |
91-005R0.PDF |
Addition to Set Features command |
S. Anderson |
156606 | [3/7/91] |
91-006R1.PDF |
How does one change the Active Notch field in the Notch Mode page? |
M. Peper |
596071 | [3/7/91] |
91-007R0.TXT |
Low-Power Differential Working Group Minutes January 14, 1991 |
Lamers/ Lohmeyer |
4824 | [3/7/91] |
91-008R0.TXT |
SCSI-2 Message System Cleanup |
G. Stephens |
3746 | [ ] |
91-008R1.TXT |
SCSI-2 Message System Cleanup |
G. Stephens |
3741 | [3/7/91] |
91-009R0.TXT |
X3T9.2 Annual Report for 1990 |
J. Lohmeyer |
109500 | [3/7/91] |
91-010R11 |
draft working document SCSI-3 Parallel Interface (SPI) |
Lawrence J. Lamers |
Missing | [ ] |
|
draft working document SCSI-3 Parallel Interface (SPI) |
Lawrence J. Lamers |
| [5/14/92] |
91-011R1.PDF |
draft working document SCSI-3 Interlocked Protocol (SIP) |
K. Chan |
10184702 | [3/24/92] |
91-012R0 |
draft working document SCSI-3 Command Set (SCS) |
|
Missing | [ ] |
91-013R1.TXT |
SCSI-3 Generic Packetized Protocol Proposal |
G. Stephens |
358175 | [ ] |
91-013R3.PDF |
SCSI-3 Generic Packetized Protocol Proposal |
G. Stephens |
20028573 | [1/15/93] |
91-013R4 |
working draft SCSI-3 Generic Packetized Protocol (GPP) |
G. Stephens |
Missing | [ ] |
91-014R1.PDF |
Control of SCSI Device Power Consumption |
G. Penokie |
1237523 | [3/7/91] |
91-014R3.PDF |
Control of SCSI Device Power Consumption |
G. Penokie |
1716958 | [5/6/91] |
91-014R5.TXT |
Control of SCSI Device Power Consumption |
G. Penokie |
20317 | [ ] |
91-014R6.TXT |
Control of SCSI Device Power Consumption |
G. Penokie |
21418 | [7/22/91] |
91-015R0.TXT |
Changes for the Latest CAM document |
J. Gallant |
32492 | [3/7/91] |
91-016R0.PDF |
Working Group Week Meeting Notice: Harrisburg May 13-17, 1991 |
C. Brill |
555648 | [3/7/91] |
91-017R0.PDF |
Ltr from Kris Gonda (ANSI) to Larry Lamers Re: SCSI-2 Editing |
K. Gonda |
192151 | [3/7/91] |
91-018R0.PDF |
Glitch Report--Silicon and Stub |
B. Spence |
1834848 | [3/7/91] |
91-019R0.TXT |
Using MODE SELECT to reset a drive to defaults |
P. Hanmann |
3877 | [3/7/91] |
91-020R0.PDF |
Low-Power Differential Test Setup and Results |
G. Murdock |
1356246 | [3/7/91] |
91-021R0.PDF |
SCSI-2 Additions to Reconcile ISO 8482 and RS-485 Electrical Specs. |
G. Murdock |
386276 | [3/7/91] |
91-022R0.TXT |
Requirements for a Diagnostic Command Set |
J. McGrath |
9139 | [3/7/91] |
91-023R0.PDF |
Foils re ESDI Power Pin issue presented 2/19/91 |
J. McGrath |
1173416 | [3/7/91] |
91-024R0.TXT |
Requirements for Implementing Tagged Command Queuing |
J. McGrath |
18561 | [3/7/91] |
91-025R0.PDF |
SCSI-3 Architecture |
Chan/ Lohmeyer/ Penokie |
261821 | [3/7/91] |
91-026R0.TXT |
X3T9.2 Meeting #92 Minutes -- February 18-19, 1991 |
Lamers/ Lohmeyer |
133396 | [3/7/91] |
91-027R0.TXT |
New Additional Sense Code (5Dh) |
G. Penokie |
684 | [3/7/91] |
91-027R1.TXT |
New Additional Sense Code (5Dh) |
G. Penokie |
639 | [5/6/91] |
91-028R0.TXT |
ltr re the Scanner Working Group Meeting -- April 24, 1991 |
J. Lohmeyer |
4135 | [3/7/91] |
91-029R0.PDF |
SCSI-3 CCS for scanner devices |
G. Tharakan |
312074 | [3/7/91] |
91-030R0.TXT |
Cabling Article Submission |
B. Spence |
9569 | [3/7/91] |
91-031R0.TXT |
Cable Issues |
B. Spence |
3928 | [3/7/91] |
91-032R0.TXT |
Response to ATN during RESELECTION |
G. Houlder |
4700 | [3/7/91] |
91-033R0.PDF |
Agenda items for April 24 Scanner Working Group Meeting |
G. Villapiano |
265263 | [3/7/91] |
91-034R1.TXT |
Response to X3T9.2/90-173 Document |
G. Penokie |
3847 | [5/6/91] |
91-035R0.TXT |
Clean up of 5.6.13 MESSAGE PARITY ERROR |
B. Galloway |
1447 | [5/6/91] |
91-036R0.TXT |
SCSI-2 Medium Changer Devices field descriptions |
B. Galloway |
947 | [5/6/91] |
91-037R0.PDF |
FPT - Forced Perfect Termination |
T. Le |
1621369 | [5/6/91] |
91-038R0.PDF |
FPT - Forced Perfect Termination (Foils) |
T. Le |
2310843 | [5/6/91] |
91-039R1.PDF |
Media Changer Device Capabilities Page |
P. Boulay |
6160 | [5/6/91] |
91-040R0.TXT |
Request for Interpretation of SCSI-2 on the use of MODE SENSE data |
D. Hagerman |
3917 | [5/6/91] |
91-041R0.TXT |
Sunnyvale Working Group Minutes |
Lamers/ Lohmeyer |
21876 | [5/6/91] |
91-042R0.TXT |
Data Compression Working Group Meeting 3/18/91 |
J. Lohmeyer |
7009 | [5/6/91] |
91-043R0.PDF |
Questions about SCSI-2 Sequential-Access Devices |
D. Moore |
769731 | [5/6/91] |
91-044R0 |
Commands to support Multi-pathing in SCSI-3 |
G. Stephens |
Missing | [ ] |
91-045R0.PDF |
Sequential Access Density Code Correction |
C. Pisciotta |
205446 | [5/6/91] |
91-046R0.TXT |
Proposed Changes and Additions for Common Access Method |
J. Gallant |
25192 | [ ] |
91-046R1.PDF |
Proposed Changes and Additions for Common Access Method |
J. Gallant |
2134878 | [7/22/91] |
91-047R0.TXT |
DC Power Connector for Personal Computer Peripherals |
G. Milligan |
4257 | [5/6/91] |
91-048R1.TXT |
Suggested Minimum DCS Model |
G. Milligan |
12680 | [5/6/91] |
91-049R1.TXT |
SCSI Bus Type Identification |
J. Lohmeyer |
1998 | [5/6/91] |
91-050R0.PDF |
Fax re IT8/WG14 Scanner Activities |
R. Prichard |
1903498 | [5/6/91] |
91-051R0.PDF |
MODE SELECT Error Detection |
B. Galloway |
468526 | [5/6/91] |
91-052R0.TXT |
Cable Select Feature |
J. McGrath |
5525 | [ ] |
91-052R1.TXT |
Cable Select Feature |
J. McGrath |
7016 | [7/22/91] |
91-053R0.TXT |
Various SCSI Interpretation Questions |
D. Hagerman |
3442 | [5/6/91] |
91-054R0.PDF |
Low-cost Serial Interface Presentation giving 4/23/91 |
B. Johnson |
5287612 | [5/6/91] |
91-055R0.PDF |
Draft Detailed Charter for the IEEE Disk Attach Working Group |
Anon |
258998 | [5/6/91] |
91-056R0.TXT |
New SCSI Commands for FFS (Flat File System) |
J. McGrath |
6856 | [5/6/91] |
91-057R1.TXT |
Meeting Announcement - July '91 X3T9 Working Group Meetings |
D. Morrissey |
2116 | [5/6/91] |
91-058R0.TXT |
X3T9.2 Meeting #93 Minutes -- April 22-23, 1991 |
Lamers/ Lohmeyer |
115305 | [ ] |
91-058R1.TXT |
X3T9.2 Meeting #93 Minutes -- April 22-23, 1991 |
Lamers/ Lohmeyer |
116086 | [5/6/91] |
91-059R0.TXT |
SCSI-3 Scanner Working Group Meeting Minutes -- April 24, 1991 |
J. Lohmeyer |
4286 | [5/6/91] |
91-060R0.PDF |
Recommended change to SCSI-2 |
E. Luttig |
298914 | [5/6/91] |
91-061R0.PDF |
Proposal to add 60/68-pin ribbon-contact style connector to standard |
M. Lazar |
1043907 | [5/6/91] |
91-062R0.TXT |
Outbound disconnect and Disconnect Time Limit |
T. Wicklund |
1630 | [5/6/91] |
91-063R0.PDF |
SCSI Identifier Symbols |
B. Medlinski |
246841 | [5/6/91] |
91-064R0.TXT |
Fast Single-Ended and other Recommended Changes to SCSI-3 Parallel I/F |
D. Steele |
8025 | [ ] |
91-064R1.PDF |
Fast Single-Ended and other Recommended Changes to SCSI-3 Parallel I/F |
D. Steele |
1004162 | [7/22/91] |
91-064R2.TXT |
Fast Single-Ended and other Recommended Changes to SCSI-3 Parallel I/F |
D. Steele |
6085 | [ ] |
91-064R3.PDF |
Fast Single-Ended and other Recommended Changes to SCSI-3 Parallel I/F |
D. Steele |
1078202 | [1/21/92] |
91-065R0.TXT |
Tagged Queuing Restrictions |
J. McGrath |
1224 | [7/22/91] |
91-066R0.TXT |
Using a PCMCIA Interface on 1.8' Winchester Disk Drives |
J. McGrath |
4910 | [7/22/91] |
|
Request for new SCSI Peripheral Device Type 'Floptical' |
A. Wilhelm |
| [7/22/91] |
91-068R0.PDF |
Proposal for addition of two new Medium Types to Table 8-45 |
A. Wilhelm |
218680 | [7/22/91] |
91-069R0.PDF |
Conformance of SPP and Fiber Channel |
B. Snively |
565855 | [7/22/91] |
91-070R0.TXT |
Harrisburg Working Group Minutes |
Lohmeyer |
24296 | [7/22/91] |
91-071R1.TXT |
Direct-access removable media ASCQs (another Penokie request) |
G. Penokie |
1093 | [7/22/91] |
91-072R0.PDF |
Additional Medium Changer features to improve interoperation |
D. Therrien |
511947 | [7/22/91] |
91-073R0.TXT |
SCSI Bus Type Identification |
D. Allan |
1228 | [7/22/91] |
91-074R0.TXT |
Draft Project Proposal for SCSI Diagnostic Command Set |
D. Allan |
7360 | [7/22/91] |
91-075R0.TXT |
Proposal to support removable media drives on ATA Interface |
P. Manley |
25789 | [7/22/91] |
91-075R0.PDF |
Proposal to support removable media drives on ATA Interface |
P. Manley |
1896033 | [7/22/91] |
91-076R0.TXT |
LUNTAR, LUNTRN Bits, and Target Routine Functions |
P. Dougherty |
1798 | [7/22/91] |
91-077R0.PDF |
ltr to Ken Jochim (PRAIRIETEK) re Patent Number 4933785, Claim 45 |
D. Allan |
311223 | [7/22/91] |
91-078R0.PDF |
X3 approval of deletion of Project 685-D, SCSI-3 |
L. Barra |
273424 | [7/22/91] |
91-079R0.PDF |
X3 approval of new Project 854-D, SCSI-3 Command Set |
L. Barra |
260327 | [7/22/91] |
91-080R0.PDF |
X3 reconsideration of new Project ???-D, SCSI-3 Packetized Protocol |
L. Barra |
502939 | [7/22/91] |
91-081R0.PDF |
X3 approval of new Project 855-D, SCSI-3 Parallel Interface |
L. Barra |
260433 | [7/22/91] |
91-082R0.PDF |
X3 approval of new Project 856-D, SCSI-3 Interlocked Protocol |
L. Barra |
261271 | [7/22/91] |
91-083R0.PDF |
X3 approval of Pre-Publication withdrawl of X3.131-1990, SCSI-2 |
L. Barra |
221882 | [7/22/91] |
91-084R1.PDF |
Draft response to X3 negative on SCSI-3 Packetized Protocol Project |
D. Shoemaker |
2451 | [7/22/91] |
91-085R0.PDF |
Request that SCSI-2 CAM Document not be forwarded yet. |
B. Huntsman |
649026 | [7/22/91] |
91-086R0.TXT |
ltr to Fred Lucas, Chair TR30.2, re International Version of RS-485 |
G. Milligan |
6277 | [7/22/91] |
91-087R0.PDF |
Workshop on error rates and error distributions in optical disks |
F. Podio |
1261451 | [7/22/91] |
91-088R0.PDF |
Proposal to modify Device Type 0 to support Media Interchange |
A. Wilhelm |
2190825 | [7/22/91] |
91-089R0.PDF |
Industry Standardization of 60 & 68 Position Ribbon Contact Connectors |
M. Lazar |
10769849 | [7/22/91] |
91-090R0.TXT |
Media Scan Command, SCSI-2, Chapter 15 |
P. Boulay |
5006 | [7/22/91] |
91-091R2.TXT |
X3T9.2 Meeting #94 Minutes -- June 17-18, 1991 |
Lamers/ Lohmeyer |
130581 | [7/22/91] |
91-092R0.PDF |
ltr to Dal Allan re PrairieTek patent 4933785 |
K. Jochim |
311377 | [7/22/91] |
91-093R0.PDF |
Analysis of Nonlinear SCSI Bus Termination |
K. Chan |
3910351 | [7/22/91] |
91-094R0.PDF |
Adding a Conformance Clause to CAM |
B. Huntsman |
5113 | [7/22/91] |
91-095R0.PDF |
Removing Assumptions about Target Devices |
B. Huntsman |
6023 | [7/22/91] |
91-096R0.PDF |
Clarifying Relationship of XPT to SIM |
B. Huntsman |
5557 | [7/22/91] |
91-097R0.PDF |
Minor Problems with CAM |
B. Huntsman |
11661 | [7/22/91] |
91-098R0.TXT |
SCSI-3 Queuing Model |
G. Penokie |
15917 | [ ] |
91-098R1.TXT |
SCSI-3 Queuing Model |
G. Penokie |
11800 | [9/11/91] |
91-098R2.TXT |
SCSI-3 Queuing Model |
G. Penokie |
6173 | [ ] |
91-098R3.TXT |
SCSI-3 Queuing Model |
G. Penokie |
6165 | [ ] |
91-098R4.TXT |
SCSI-3 Queuing Model |
G. Penokie |
8132 | [ ] |
91-098R5.TXT |
SCSI-3 Queuing Model |
G. Penokie |
10065 | [ ] |
91-098R7.TXT |
SCSI-3 Queuing Model |
G. Penokie |
10876 | [5/14/92] |
91-098R9.TXT |
SCSI-3 Queuing Model |
G. Penokie |
12175 | [7/15/92] |
91-099R0.PDF |
Fabric Loop Meeting, June 18, 1991 |
G. Stephens |
10822788 | [7/22/91] |
91-100R0.TXT |
Meeting Announcement - Sept '91 X3T9 Working Group Meetings |
R. Cummings |
1274 | [7/22/91] |
91-101R0.PDF |
Proposed Common Configuration Method for ATA |
R. Richens |
440857 | [7/22/91] |
91-102R0.TXT |
Request for Two Tape Media Identifiers |
D. Hagerman |
1212 | [ ] |
91-102R1.TXT |
Request for Two Tape Media Identifiers |
D. Hagerman |
1213 | [7/22/91] |
91-103R0.PDF |
SCSI-2 91-043 R0 Written Response |
G. Stephens |
587168 | [7/22/91] |
91-104R1.TXT |
Project Proposal for ATA Extensions |
D. Allan |
6855 | [7/22/91] |
91-105R0.PDF |
Multi-Initiator, Enhanced Availability System Environments in SCSI-3 |
E. Gardner |
1137920 | [7/22/91] |
91-106R1.TXT |
Format Status Log Page |
D. Pickford |
9061 | [9/11/91] |
91-106R3.PDF |
Format Status Log Page |
D. Pickford |
966880 | [11/6/91] |
91-106R4.PDF |
Format Status Log Page |
D. Pickford |
1011945 | [1/21/92] |
91-107R0.TXT |
Error in Implementors Note 1) in section 6.9 of SCSI-2 Rev 10e |
J. Lohmeyer |
2929 | [7/22/91] |
91-108R0.TXT |
Project Proposal for Directly-Addressable Device Interface (DADI) |
D. Allan |
7662 | [7/22/91] |
91-108R1.TXT |
Project Proposal for Directly-Addressable Device Interface (DADI) |
D. Allan |
7863 | [7/15/92] |
91-109R0.TXT |
Project Proposal for Flat File Command Set |
D. Allan |
7421 | [7/22/91] |
91-109R1.TXT |
Project Proposal for Flat File Command Set |
D. Allan |
7468 | [11/6/91] |
91-110R0.PDF |
Valley Forge Working Group Minutes |
Lamers/ Lohmeyer |
24064 | [7/22/91] |
91-111R0.PDF |
Fault Isolation Information Study Group (FIISG) |
P. Fessler |
1986328 | [7/22/91] |
91-112R0.PDF |
News Release on SCSI-3 Command Set Project (854-D) |
X3 Secretariat |
386877 | [7/22/91] |
91-113R0.PDF |
News Release on SCSI-3 Interlocked Protocol Project (856-D) |
X3 Secretariat |
391482 | [7/22/91] |
91-114R0.PDF |
Response to P. Borrill (IEEE) re 'Disk Attach Interface' project |
D. Shoemaker |
309297 | [9/11/91] |
91-115R0.PDF |
Notification of Approval of Standard (ESDI) |
L. Barra |
352760 | [9/11/91] |
91-116R0.PDF |
News Release on SCSI-3 Parallel Interface Project (855-D) |
X3 Secretariat |
376152 | [9/11/91] |
91-117R0.PDF |
ANSI Style Manual for Preparation of Proposed ANS (eighth edition) |
K. McMillan |
671723 | [9/11/91] |
91-118R0.PDF |
Dealing with multi-initiator issues |
G. Hahn |
352955 | [9/11/91] |
91-119R0.PDF |
Caching codes missing from ATA Rev 2.5 |
J. McGrath |
176446 | [9/11/91] |
91-120R0.PDF |
X3 approval of new Project 881-D, SCSI-3 Packetized Protocol |
L. Barra |
241636 | [9/11/91] |
91-121R0.PDF |
Comments on X3T9.2/91-72 (Medium Changer Devices) |
B. Raudebaugh |
849791 | [9/11/91] |
91-122R0.PDF |
SCSI-3 Fiber Channel Protocol Proposal |
B. Snively |
5706055 | [9/11/91] |
91-122R1.PDF |
SCSI-3 Fiber Channel Protocol Proposal |
B. Snively |
5716230 | [3/24/92] |
91-123R0.PDF |
Assignment of Project No. 881-D, SCSI-3 Packetized Protocol |
L. Barra |
239884 | [9/11/91] |
91-124R0.PDF |
News Release on SCSI-3 Packetized Protocol Project (881-D) |
X3 Secretariat |
412470 | [9/11/91] |
91-125R1.PDF |
Request for Sequential-Access density code |
C. Pisciotta |
170716 | [9/11/91] |
91-126R1.PDF |
Comparison of S/E Cable/Terminator Options |
B. Spence |
2121842 | [9/11/91] |
91-127R0.TXT |
Tagged Queuing Implementation Example |
G. Penokie |
14066 | [9/11/91] |
91-128R0.PDF |
Disk Attach Project |
D. Allan |
5474955 | [9/11/91] |
91-129R0.PDF |
Background to Material Submitted |
D. Allan |
445857 | [9/11/91] |
91-130R1.PDF |
Active Negation Drivers and Alt-2 Termination |
K. Chan |
489555 | [9/11/91] |
91-131R0.TXT |
Meeting Announcement -- November Working Group Meetings |
D. Tolmie |
1537 | [9/11/91] |
91-132R0.PDF |
Changes in ATA Document, Revision 2.5, July 16,1991 |
J. Chen |
242854 | [9/11/91] |
91-133R0.PDF |
Presentation: Description of SCSI FC-4 |
B. Snively |
1390043 | [9/11/91] |
91-134R0.PDF |
Scanner Proposal |
T. Motoyama |
187443 | [9/11/91] |
91-135R0.TXT |
Response to X3T9 LB Negative on forwarding SCSI-1 for reaffirmation |
D. Shoemaker |
1246 | [9/11/91] |
91-136R0.TXT |
X3T9 Position letter of IEEE Disk Attach Project |
D. Shoemaker |
3404 | [ ] |
91-136R1.PDF |
X3T9 Position letter of IEEE Disk Attach Project |
D. Shoemaker |
442692 | [9/11/91] |
91-137R0.TXT |
X3T9.2 Meeting #95 Minutes -- August 19-20, 1991 |
Lamers/ Lohmeyer |
129916 | [9/11/91] |
91-138R0.PDF |
ltr to Shoemaker re Memory Model I/F Proj Proposal (now DADI) |
M. Freeman |
575398 | [9/11/91] |
91-139R0.PDF |
Fax to Tharakan re SCSI-3 Scanner Working Group |
G. Battrick |
461422 | [9/11/91] |
91-140R0.TXT |
Proposed Additions and Modifications to CAM interface |
Abilay et al |
5640 | [9/11/91] |
91-140R1.PDF |
Proposed Additions and Modifications to CAM interface |
Abilay et al |
266918 | [11/6/91] |
91-141R0.TXT |
Minutes of Scanner Working Group Meeting August 21, 1991 |
J. Lohmeyer |
3369 | [9/11/91] |
91-142R0.PDF |
ltr to Freeman re his letter (91-138) on Memory Model I/F (now DADI) |
D. Shoemaker |
195484 | [9/11/91] |
91-143R0.PDF |
ltr to G. Houlder re SCSI-3 dual port issues |
S. Kolansky |
1140446 | [9/11/91] |
91-144R0.PDF |
Letter to Camp enclosing X3T9 position paper (91-136R1) |
D. Shoemaker |
262480 | [9/11/91] |
91-145R0.PDF |
Meeting Announcement & Draft Agenda for WG on Optical Disk Error Rates |
F. Podio |
688253 | [9/11/91] |
91-146R0.PDF |
Minutes of Workshop on Optical Disk Error Rate Monitoring and Reporting |
F. Podio |
1960309 | [9/11/91] |
91-147R0.TXT |
ltr to C. Camp re his August 8, 1991 letter on IEEE DASG |
J. Lohmeyer |
1629 | [9/11/91] |
91-148R0.TXT |
AEN via Request Sense |
J. Williams |
3687 | [9/11/91] |
91-149R0.TXT |
Extensions for dual port SCSI (again) |
G. Houlder |
28233 | [9/11/91] |
91-150R0.TXT |
SDTR and WDTR Clarification |
J. Lohmeyer |
5440 | [9/11/91] |
91-151R0.TXT |
Possible S/E Active-Negation Driver Requirements for SCSI-3 |
B. Spence |
3219 | [11/6/91] |
91-152R0.PDF |
ltr to Somerville requesting ESDI be sent to ISO |
D. Allan |
188143 | [11/6/91] |
91-153R0.PDF |
Proposed SCSI-3 I/O Process Progress Messages |
E. Gardner |
679916 | [11/6/91] |
91-154R0 |
not used |
|
Missing | [ ] |
91-155R0 |
not used |
|
Missing | [ ] |
91-156R0.PDF |
St. Paul Working Group Minutes |
Lamers/ Lohmeyer |
20136 | [11/6/91] |
91-157R1.TXT |
SCSI-3 Queuing Working Group Meeting Minutes |
Penokie/ Lohmeyer |
4935 | [11/6/91] |
91-158R0.PDF |
Response to D. Allan request re ESDI (see 91-152) |
B. Somerville |
187019 | [11/6/91] |
91-159R0.PDF |
DIFFSENSE Signal Loading Issue |
J. Lohmeyer |
29949 | [11/6/91] |
91-160R0.PDF |
SCSI-3 Proposed Queueing Model |
S. Cornaby |
1301029 | [11/6/91] |
91-161R0.PDF |
Interpretation of Section 6.5.2 of SCSI-2 |
D. DesRoches |
207702 | [11/6/91] |
91-162R0.PDF |
Proposed change in time units for Timeout Value field in CAM |
S. Smyers |
186624 | [11/6/91] |
91-163R0.PDF |
Command Queuing Model |
J. McGrath |
3016988 | [11/6/91] |
91-164R0.PDF |
X3 Trade Association |
J. McGrath |
324174 | [11/6/91] |
91-165R0.PDF |
FFS Press Release |
J. McGrath |
163659 | [11/6/91] |
91-166R0.TXT |
Report on IEEE NESCOM Meeting 9/25/91 |
L. Lamers |
1556 | [11/6/91] |
91-167R0.PDF |
Agenda for the 10/10 Irvine Driver/Terminator Conference |
B. Spence |
883486 | [11/6/91] |
91-168R2.TXT |
Draft Minutes of the 10/10 Irvine Driver/Terminator Conference |
B. Spence |
22477 | [11/6/91] |
91-169R0.PDF |
Results of X3T9 LB to forward SCSI-2 CAM as dpANS |
R. Fink |
697764 | [11/6/91] |
91-170R0.PDF |
ltr to Lamers with questions on SCSI-2 |
M. Mori |
352572 | [11/6/91] |
91-171R0.PDF |
Memory Card Overview Presentation |
S. Sharp |
8414425 | [11/6/91] |
91-172R0.PDF |
High Perfomance Serial Bus (P1394) Presentation |
M. Teener |
13751030 | [11/6/91] |
91-173R0.TXT |
X3T9.2 Meeting #96 Minutes -- October 14-15, 1991 |
Lamers/ Lohmeyer |
139189 | [11/6/91] |
91-174R0.PDF |
Proposed Additional Connector to SCSI-3 Physical Interface |
G. Penokie |
166248 | [11/6/91] |
91-175R0.TXT |
Houston, 01/92, Meeting Announcement |
P. Savage |
2103 | [11/6/91] |
91-176R0.TXT |
SCSI Data Phase LRC proposal |
G. Penokie |
3709 | [11/6/91] |
91-176R1.TXT |
SCSI Data Phase LRC proposal |
G. Penokie |
4704 | [1/21/92] |
91-177R0.PDF |
Proposed Resistor Values for Low-End S/E Terminator |
B. Spence |
330449 | [11/6/91] |
91-178R0.PDF |
Proposed Specifications for High-End S/E Terminator |
B. Spence |
640782 | [11/6/91] |
91-179R0.PDF |
Proposed Specifications for S/E Shielded Cables |
B. Spence |
607643 | [11/6/91] |
91-179R1.PDF |
Proposed Specifications for S/E Shielded Cables |
B. Spence |
724225 | [1/21/92] |
91-180R0.TXT |
Question on Synchronous Transfer Agreement |
G. Houlder |
1813 | [11/6/91] |
91-181R0.PDF |
Results of X3T9 LB to forward AT Attachment as dpANS |
R. Fink |
457477 | [11/6/91] |
91-182R0.PDF |
1992-1993 Fees for Participation in X3, JTC1 TAG, and Their Subgroups |
J. Pickitt |
593084 | [11/6/91] |
91-183R0.TXT |
SCSI-3 Queuing Working Group Minutes 10/14/91 |
Lamers/ Penokie |
2440 | [11/6/91] |
91-184R0.TXT |
Additional Comment on ATA Rev 2.6 |
G. Milligan |
4470 | [11/6/91] |
91-185R0.PDF |
Voh/Ioh specification for active negation drivers |
D. Steele |
1111702 | [1/21/92] |
91-186R0.PDF |
Addition of a new Message to SCSI-3 Message Set |
S. Teymouri |
295855 | [1/21/92] |
91-187R0.PDF |
Proposal for a Portable Machine SCSI Bus Termination |
F. Oprescu |
2510807 | [1/21/92] |
91-188R0.PDF |
SCSI Active Deassertion |
F. Oprescu |
2240297 | [1/21/92] |
91-189R2.PDF |
SCSI-3 Serial Bus Protocol Proposal |
S. Smyers |
15888024 | [3/24/92] |
91-190R0.PDF |
SCSI3 CCS over P1394 (presentation) |
S. Smyers |
2226301 | [1/21/92] |
91-191R0.PDF |
SCSI-2 CAM Changes Proposal |
Wolf/ Smyers |
297816 | [1/21/92] |
91-192R0.PDF |
Apple Late 1991 CAM Proposals Summary |
P. Wolf |
594828 | [1/21/92] |
91-193R0.PDF |
IPI Command Queuing |
E. Grivna |
1617356 | [1/21/92] |
91-194R0.PDF |
Driver and Terminator Terminal Characteristics |
B. Spence |
559869 | [1/21/92] |
91-195R0.PDF |
'What's In a Queue' presentation |
E. Gardner |
269522 | [1/21/92] |
91-196R0.PDF |
Electrical Characteristics Standards (EIA/TIA-485.1983 & ISO 8482.1987) |
J. Goldie |
494675 | [1/21/92] |
91-197R0.PDF |
Comparison of Electrical Char. Stnds: EIA/TIA-485.1983 & ISO 8482.1987 |
J. Goldie |
230933 | [1/21/92] |
91-198R0.PDF |
Recommendations for consideration into SCSI-3 Parallel Interface (SPI) |
R. Muething |
3106217 | [1/21/92] |
91-199R2.PDF |
SCSI-3 Packetized Protocol (SPP) Pathing Commands |
G. Stephens |
4857165 | [1/15/93] |
91-200R0.PDF |
Albuquerque Working Group Minutes |
Lamers/ Lohmeyer |
25567 | [1/21/92] |
91-201R0.PDF |
Albuquerque Queuing Working Group Minutes |
Lamers/ Penokie |
8030 | [1/21/92] |
91-202R0.PDF |
P1394 (Serial Bus) Physical Layer for Cable Medium |
R. Van Brunt |
1452244 | [1/21/92] |
91-203R0.PDF |
ltr to Jean-Paul Emard re sending ANSI X3.170A to ISO |
D. Allan |
219869 | [1/21/92] |
91-204R0.TXT |
March '92 Working Group Meeting Announcement |
M. Martinez |
1151 | [1/21/92] |
91-205R0.TXT |
ltr to William Burr re his X3T9 LB cmnt on SCSI-2 CAM |
J. Lohmeyer |
1239 | [1/21/92] |
91-206R0.TXT |
ltr to Gene Milligan re his X3T9 LB cmnt on ATA |
J. Lohmeyer |
2837 | [1/21/92] |
91-207R0.PDF |
Periodic LRC/CRC Proposal |
E. Gardner |
2369735 | [1/21/92] |
91-208R0.PDF |
LRC/CRC Negotiation, Commands vs. Messages |
E. Gardner |
858087 | [1/21/92] |
91-209R0.PDF |
A Modest Proposal |
B. Spence |
611818 | [1/21/92] |
91-210R0.TXT |
Discussion of SIM handling of CAM Command Timeouts |
A. Youngwerth |
1002 | [1/21/92] |
91-211R0.TXT |
Freezing of LUN Queues following a SCSI Bus Reset |
A. Youngwerth |
2105 | [1/21/92] |
91-212R0.PDF |
Command Queuing exerts from IPI |
D. Hagerman |
1680323 | [1/21/92] |
91-213R0.PDF |
Fast single ended and other recommendations for SCSI-3 |
R. Allgood |
31630 | [1/21/92] |
91-213R0.ZIP |
Fast single ended and other recommendations for SCSI-3 (ZIP'd XLS file) |
R. Allgood |
9741 | [ ] |
91-214R0.PDF |
The Dip |
F. Oprescu |
5420133 | [1/21/92] |
91-215R0.PDF |
FPT sustained currents |
S. Ego |
1452960 | [1/21/92] |
91-216R0.TXT |
X3T9.2 Meeting #97 Minutes -- December 9-10, 1991 |
Lamers/ Lohmeyer |
135302 | [1/21/92] |
91-217R0.TXT |
SCSI-3 Queuing Working Group Minutes 12/10/91 |
Lamers/ Penokie |
4000 | [1/21/92] |
91-218R0.TXT |
SPI Working Group Minutes 12/10/91 |
Lamers/ Spence |
20972 | [1/21/92] |
91-219R0.PDF |
Recommended changes to ISO 8482 to make compatible with EIA/TIA 485 |
J. Goldie |
912486 | [1/21/92] |
91-220R0.PDF |
ltr to Milligan proposing ISO 8482 not be changed to match EIA/TIA 485 |
J. Schwandt |
302026 | [1/21/92] |